Global Research Ventures (GRV)
Medical Marijuana Extracting Facility
Adelanto, CA

The Result
20,000 sq. ft. facility- Turnkey Construction from financing to engineering to construction with pre-engineered steel buildings, structural slab and roof loaded with heavy air-conditioning units and electrical roof top units.